  1. Information required:
    A Plat of Survey may be required if determined necessary by field inspection
    2 Full set of Plans
    Code Analysis: Title block, type of work being done, type of construction, use group, installed fire protection, design options
    Architectural drawing: wall, floor, foundation, elevations, sections and details
    Site Map of property for project (showing setbacks, contours, elevations, parking)
    Utility Plan: location of sanitary sewer, fire hydrants, outside lighting
    Grading Plan: benchmark information and drainage
    Plumbing Plans: riser diagrams, fixture count, type of piping, etc
    Mechanical Plans: duct design, catalog cuts, vent schedule, etc
    Electrical Plans: fixtures, outlets, panels, conduit, schedules, etc
    Sprinkler Plans: number and location of fixtures, occupancy, etc
    All contractors and sub-contractors involved in this project will be required to be registered with the City of Aledo
    *If demolishing a structure for this project, please complete a separate demolition permit application.




  2. PROPERTY OWNER INFORMATION

  3. APPLICANT INFORMATION IF NOT OWNER

  4. CONTRACTOR INFORMATION: (Please check all that applies)*


  5. PROPERTY DETAILS:

  6. Please upload a full set of plans, if applicable:
    Note: Plans can be mailed to:
    City of Aledo
    120 N College Ave.
    Aledo, IL 61231
    If mailed, please submit 2 sets of plans.

  7. If a full set of plans is not applicable, please submit the following that applies to your project:












  8. By submitting this application the applicant does hereby acknowledge and affirm the following: (1) That he or she is the project property owner or authorized agent; (2) That the issuance of the requested permit is conditioned upon the consent of the permit holder and his or her employees, contractors or other agents, to comply with the codes, rules, specifications and ordinances of the City of Aledo; (3) That the permit holder shall obtain all required inspections for the project; (4) That the permit does not grant any right or privilege to violate the codes and ordinances of the City of Aledo; (5) That a failure to commence work within 180 days of the issuance of this permit or a failure to complete such work within one year of permit issuance shall invalidate the permit and require an extension or new permit as allowed by the building official; (6) That inspections outside of normal business hours, missed inspections or those caused by modifications or noncompliance shall be assessed an additional $50.00 per inspection; (7) That a failure to obtain the required inspections or a violation of codes, rules, specifications or ordinances of the City shall be cause to suspend or revoke the permit and shall further be cause for the City to seek compliance in a manner as provided by law.