Inspections
Projects Requiring Inspections
Inspections are required for all permit projects. The following is a partial list of required inspections. A complete list of inspection requirements is provided on or with each permit:New 1 & 2 Family Residences & Additions
- Pre-pour driveway, sidewalks, foundations
- Rough carpentry
- Underground drain, plumbing, electrical before covering same
- Rough Plumbing
- Rough Electrical
- Final electrical
- Final HVAC
- Final plumbing
- Certificate of Occupancy
New Multi-Family, Commercial & Industrial Buildings & Additions
- Alternative inspection schedule may be agreed to for large projects
- Elevator, detection and suppression tests are required and shall be witnessed
- Same as for 1 and 2 family residences
Building Rehabilitation & Fire Repairs
- All electrical, plumbing, HVAC and carpentry shall be inspected prior to covering same
- Final occupancy inspection
Change In Use Group
- Rough Inspections: all electrical, plumbing, HVAC and carpentry shall be inspected prior to covering
- Elevator, detection and suppression tests are required and shall be witnessed
- Final occupancy inspection
Residential Detached Garages & Sheds
- Pre-pour inspection of foundation and slab after forms are installed, prior to pour
- Final inspection after structure is complete, but before interior walls are covered
Fences
- Post hole inspection after all post holes are dug, before concrete is poured
- Final Inspection after fence is completed
Swimming Pools
- Pre-inspection after pool diameter is staked or flagged
- Underground electrical (if applicable)
- Final inspection after pool walls and electrical are completed, but prior to filling pool
Roofing
- Rough: call 24 hour notice prior to tear off
- Final: call for Final inspection after roof has been completed
Concrete, Asphalt (Streets, Sidewalks, Service Walks, Parking Lots, etc.)
- Pre-pour Inspection when forms/aggregate have been installed
- Call for final after work is completed
General Plumbing, Electrical & HVAC
- Rough: after materials, systems, etc. are installed, but prior to covering same
- Final: after work has been completed